<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>انجمن آبیاری و زهکشی ایران</PublisherName>
				<JournalTitle>نشریه آبیاری و زهکشی ایران</JournalTitle>
				<Issn>2008-7942</Issn>
				<Volume>17</Volume>
				<Issue>2</Issue>
				<PubDate PubStatus="epublish">
					<Year>2023</Year>
					<Month>06</Month>
					<Day>22</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Rethinking the design of different parts of the free overflow system based on multi-level risk analysis                
(Case Study Ghezel dash)</ArticleTitle>
<VernacularTitle>باز اندیشی طراحی بخش های مختلف سامانه سرریز بر اساس تحلیل ریسک چند سطحی (مطالعه موردی سد قزل داش)</VernacularTitle>
			<FirstPage>193</FirstPage>
			<LastPage>205</LastPage>
			<ELocationID EIdType="pii">170357</ELocationID>
			
			
			<Language>FA</Language>
<AuthorList>
<Author>
					<FirstName>سعید</FirstName>
					<LastName>اقبالی زاده</LastName>
<Affiliation>عمران ، دانشکده مهندسی ، دانشگاه آزاد اسلامی ، مشهد ، ایران</Affiliation>

</Author>
<Author>
					<FirstName>عباسعلی</FirstName>
					<LastName>قزلسوفلو</LastName>
<Affiliation>مهندسی عمران، دانشگاه ازاد مشهد</Affiliation>
<Identifier Source="ORCID">0000-0002-4057-7213</Identifier>

</Author>
<Author>
					<FirstName>جواد</FirstName>
					<LastName>علامتیان</LastName>
<Affiliation>مهندسی عمران- دانشگاه آزاد - مشهد</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2022</Year>
					<Month>09</Month>
					<Day>25</Day>
				</PubDate>
			</History>
		<Abstract>Abstract &lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;In this research, considering the issue of rethinking the design of different parts of the open overflow system based on the multi-level risk method in the implementation of the Qezal Dash overflow project, the statistical community of the research, in addition to the opinions of all managers and stakeholders of the Qezal Dash dam, including the opinions of experts He has also been an expert in the subject of research.&lt;br /&gt;&lt;br /&gt;In this section, expert opinions regarding the issue of multi-level risk method of each of the processes and executive departments in the field of support and elimination of safety risks of Qezal Dash Dam have been investigated. Examining the opinions of experts has shown that reducing the safety risks and risks of Qezal Dash dam in terms of time and money in the implementation stages in the field of support and elimination of safety risks of Qezal Dash Dam can greatly reduce both the time of doing the work and the risks. to reduce the safety and anticipated risks of Qezel Dash Dam.&lt;br /&gt;&lt;br /&gt;The investigation showed that the risk of errors in the control structure has the highest risk (47.167 times) and rethinking in this part has the highest degree of importance. The investigation has shown that the risk of cavitation phenomenon (37.668 times) has the highest risk after the risk of defects in the control structure, and rethinking in this section has the highest degree of importance. The investigation showed that the risk of imbalance in the discharge channel (30.666 times) compared to the existing capacity after the risk of defects in the control structure and the risk of cavitation phenomenon has the highest risk and rethinking in this part has the highest degree of importance.&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;Keywords :Cavitation, Control Structure, Discharge Channel, FreeOverflow System, Multi-Level Risk Analysis.</Abstract>
			<OtherAbstract Language="FA">چکیده &lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;در این پژوهش، با توجه به موضوع بازاندیشی طراحی بخش های مختلف سامانه سرریز آزاد بر اساس روش ریسک چند سطحی در اجرای پروژه سرریز سد قزل داش، جامعه آماری پژوهش، علاوه بر نظرات کلیه مدیران و دست اندرکاران سد قزل داش، شامل دیدگاه های کارشناسان خبره در رابطه با موضوع پژوهش نیز بوده است. در این بخش به بررسی دیدگاه های کارشناسی شده در رابطه با موضوع روش ریسک چند سطحی هریک از فرایند‌ها و بخش‌های اجرایی در حوزه پشتیبانی و رفع ریسک های ایمنی سد قزل داش پرداخته شده است. بررسی دیدگاه های کارشناسان نشان داده است که کاهش مخاطرات ایمنی و ریسک های سد قزل داش بصورت زمانی و ریالی در مراحل اجرا در حوزه پشتیبانی و رفع ریسک های ایمنی سد قزل داش می‌تواند تا حدود زیادی، هم ، زمان انجام کار را و هم، مخاطرات ایمنی و ریسک های پیش بینی شده سد قزل داش را کاهش دهد. بررسی نشان داده که ریسک اشکال در سازه کنترل دارای بیشترین ریسک بوده(47/167 مرتبه) و بازاندیشی در این بخش دارای بالاترین درجه اهمیت است. بررسی نشان داده است که ریسک پدیده کاویتاسیون(37/668 مرتبه) پس از ریسک اشکال در سازه کنترل، دارای بیشترین ریسک بوده و بازاندیشی در این بخش دارای بالاترین درجه اهمیت است. بررسی نشان داده که ریسک عدم تعادل در کانال تخلیه(30/666 مرتبه) نسبت به ظرفیت موجود پس از ریسک اشکال در سازه کنترل و ریسک پدیده کاویتاسیون دارای بیشترین ریسک بوده و بازاندیشی در این بخش دارای بالاترین درجه اهمیت است.&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;کلمات کلیدی : کاویتاسیون، سازه کنترل، کانال تخلیه، سامانه سرریز آزاد، تحلیل ریسک چند سطحی</OtherAbstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">کلمات کلیدی : کاویتاسیون</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">سازه کنترل</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">کانال تخلیه</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">سامانه سرریز آزاد</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">تحلیل ریسک چند سطحی</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://idj.iaid.ir/article_170357_5090f3fa04f6fcc205b7688b33d429fc.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
